Which of the following processes lead to an entry in the MRP planing file?

A.

Change of the material's procurement type

B.

Creation of purchasing contract

C.

Creation of dependent requirements

D.

Creation of sales order

E.

Change of the storage bin

When can the automatic material availability check occur in a production order?

A.

At order release

B.

At order confirmation

C.

At order creation

D.

At order settlement

You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?

A.

Make-to-order production (20)

B.

Planning at assembly level (70)

C.

Planning with final assembly (40)

D.

Planning without final assembly (50)

Which time elements are part of a routing operation?

A.

Pick/pack time

B.

Float before production

C.

Queue time

D.

Wait time

E.

Move time

What is a work center hierarchy in planning in SAP S/4HANA?

A.

A group of alternative work centers providing a cumulative available capacity for production.

B.

A group of alternative work centers for production, structured in hierarchy levels by priorities

C.

A group of work centers in a production line being used in sequence for production

D.

A group of work centers in a parallel sequence that is used to split production quantities and work on them in parallel

Which item statuses can you select inside a material BOM?

A.

Service

B.

Sales

C.

Quality management

D.

Engineering

What does a line hierarchy in repetitive manufacturing represent?

A.

A production line with a parallel sequence in the routing

B.

A production line with prioritized alternative work centers

C.

A production line with more than one work center

D.

A production line with an alternative sequence in the routing

You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?

A.

Production order release

B.

Material requirements planning

C.

Backflushing

D.

Kanban

In your plant, MRP is activated.

Which option do you have to exclude a materila from the MRP run?

A.

Use specific MRP controller

B.

Use a specific material group

C.

Use a specific material status

D.

Use a specific MRP type

How would you define pegging in the context of Advanced Planning?

A.

An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements

B.

An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements

C.

An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run

D.

An evaluation to verify if there are material or capacity shortages in the network after the production planning run.